Newcastle Building Department

WSEC-R 2021 energy code compliance resources for builders and contractors in Newcastle, King County.

Building Department

Newcastle Community Development/Permits

Address
12835 Newcastle Way, Ste 200, Newcastle, WA 98056
Hours
M-F 8am-5pm
Notes
uses MyBuildingPermit.com

Last verified: 2026-04-19

Submittal notes

These apply at King County County level — verify city-specific items directly with Newcastle Community Development/Permits.

  • King County: King County requires a '2021 Energy Compliance Summary Sheet' specifying exact HVAC equipment specs (mini-splits ≥10.0 HSPF, air-to-water heat pumps ≥3.2 COP at 47°F), hot water loop volumes (≤16 oz between source and fixture), and solar-ready provisions.
  • Seattle: Seattle: Third-party blower door test results must be physically posted near the electrical panel before final inspection.
  • Bellevue: Bellevue layers the 2023 Washington Cities Electrical Code on top of WSEC-R 2021 — additional lighting budget calculations and heat system sizing forms are required beyond other MBP-consortium jurisdictions.
  • Redmond: Redmond requires environmental checklist and critical areas report (SEPA) clearance before the building permit can issue.

Code environment

Climate Zone

CZ4

Western WA — moderate climate requirements.

Radon Zone

Zone 2

Moderate potential — mitigation recommended.

Learn more →

Ready to check your compliance?

wsec.ai generates a complete R406 credit summary you can submit with your permit application to Newcastle Community Development/Permits.

Start your WSEC compliance check →